Skip to content
D
Documentation

Manage purchase job RFQs

task
10 min readUpdated

Use this page to create a request for quotation (RFQ) for a purchase job, send it to a sub-supplier or record its submission, and move an eligible RFQ into the offer stage.

What a purchase-job RFQ is

An RFQ is the purchase-job request you send to a sub-supplier for a quotation. It sits after the material requisition (MRQ) and before the quotation stage, so it turns the items requested in the MRQ into a supplier-facing procurement request.

The purchase-job flow is:

StageWhat it represents
MRQThe material request that starts the purchase-job work.
RFQThe request sent to a sub-supplier.
QuotationsThe stage that follows an RFQ converted to an offer.
POsThe purchase-order stage after quotations.
ReceivedThe receiving stage after the purchase order.

An RFQ can be in one of these stages or exit states: Draft, SentToPrincipal, ConsederAsSentToPrincipal, ConsederAsNotSentToPrincipal, CanceledInquiry, RegretToOffer, and Offered. At SentToPrincipal or ConsederAsSentToPrincipal, use Receive Offer to convert the RFQ to an offer.

If you need to…Go to
Find an RFQ in the purchase-job listsFind and open an RFQ
Recognize the RFQ fields and item gridUnderstand the RFQ record
Create or correct a draftCreate and correct an RFQ
Send or record submissionSend or record submission and receive the offer
Reverse, regret, cancel, or delete an RFQCorrect or close an RFQ
Continue with quotationsPurchase-job quotations
Work with comments, attachments, or historyPurchase-job comments, files, and history

Before you start

An RFQ belongs to a saved purchase job, and the available actions depend on the job stage, whether the RFQ has unsaved changes, and your email access.

Confirm before you startWhy it matters
The purchase job is saved.RFQ actions require a saved record; the read-only entry check showed Purchaser and MRQ product on the entry surface.
The job is a non-direct purchase job before Order.+ RFQ is available for this route while the job is at the eligible pre-order stages.
At least one inquiry exists and the job is after Unknown and before Offer, or is Deleted.These conditions expose the RFQ panel.
You can edit the saved record and the RFQ has no unsaved changes.Saving and submission actions depend on edit access and an unchanged saved RFQ.
You know whether your account has Send Email permission and an active subscription.These determine whether the screen offers email sending or recording submission without email.
You have the sub-supplier and item information.The RFQ identifies the supplier and the items requested.
Before creating an RFQ, open the purchase-job entry and confirm that Purchaser and MRQ product are present.
The Purchasing entry surface with Purchaser and MRQ product

Find and open an RFQ

The RFQs list is the starting point for locating existing supplier requests; the purchase-job record is where you work with the RFQ panel.

Prerequisites

  • You have access to the Purchasing area.
  • You know the purchase job or supplier request you need to open.

Steps

  1. Open Purchasing.

  2. Select RFQs.

  3. In the Purchase Jobs list, select the tab that matches the work you need.

    If you need to…Select
    Search all purchase jobsAll
    Work with RFQsRFQs
    Work with quotationsQuotations
    Work with purchase ordersPOs
    Find archived workArchived
  4. Select the purchase job.

  5. Open the RFQ accordion in the purchase-job record.

Result: The purchase-job record opens with the RFQ panel available while the job is before Offer or is Deleted.

Understand the RFQ record

The RFQ panel is the collapsible part of a saved purchase-job record where you choose the supplier, review the request, and work with its items.

The Sub-supplier picker displays supplier names for eligible principal or sub-supplier accounts and excludes the local branch. The panel identifies the Sub-supplier, the Client, and the Currency. Its item grid shows these three columns:

ColumnWhat to check
Item DescriptionThe description of the requested item; this field is required.
UnitThe item's unit; the control is disabled for package items or selected products.
QtyThe requested quantity; enter a value from 1 through 999999.

The RFQ panel is an accordion, so open it to see its body. The RFQ body is available only while the inquiry is open. The purchase-job tabs are available on a saved purchase job. Follow the required markers shown on your screen.

Create and correct an RFQ

Create a draft when the purchase job needs a supplier request, then correct its supplier or item rows before saving it. A draft keeps the request editable until it is submitted or otherwise staged.

The Sub-supplier picker displays supplier names for eligible principal or sub-supplier accounts and excludes the local branch; Required Offer Type offers the exact rendered choices firm and Budget.

Prerequisites

  • The purchase job is saved, non-direct, and at an eligible stage before Order.
  • You know the sub-supplier and the items to request.
  • You have edit permission on the record.

Steps

  1. In the purchase-job record, select + RFQ.
  2. In Sub-supplier, select the supplier for this request.
  3. If Required Offer Type is shown as required, select the required offer-type choice.
  4. In each draft item row, enter or correct Item Description.
  5. In each draft item row, select Unit when the control is available.
  6. In each draft item row, enter Qty from 1 through 999999.
  7. Select Save in the RFQ panel header.

If the form rejects the draft, correct the field or item condition named by the message before selecting Save again. The RFQ panel is read-only when the record is embedded or you do not have edit permission. An RFQ with an ID can have its draft changes undone before it is staged. Delete RFQ is available only for an unstaged RFQ when the purchase job contains more than one RFQ.

Package items and selected products can make Unit unavailable. Package selection also requires at least one package item, and the item-selection action can stop when all remaining items are already selected.

Result: The purchase job contains a saved, editable RFQ draft, or the displayed validation message identifies the supplier, item, or package value that needs correction.

Send or record submission and receive the offer

Submission moves a saved unchanged draft from preparation into supplier follow-up. The screen chooses between sending an email and recording submission according to your Send Email permission and subscription.

Prerequisites

  • The RFQ is saved, unchanged, and has an ID.
  • The RFQ is an unsubmitted draft.
  • For email sending, your account has Send Email permission and the required subscription.

Steps

  1. Select the action that matches the RFQ state.

    ConditionAction
    Email sending is allowedSelect Send RFQ To Sub-supplier.
    Email sending is not allowedSelect Consider RFQ As Submitted To Sub-supplier.
    The RFQ is at SentToPrincipal and must be sent againSelect Re-send RFQ To Sub-supplier.
    The RFQ is at SentToPrincipal or ConsederAsSentToPrincipal and the offer is readySelect Receive Offer.
    The RFQ is at SentToPrincipal or ConsederAsSentToPrincipal and the submitted state must be reversedSelect Consider RFQ As Not Submitted.

Result: Recording submission sets the inquiry stage to ConsederAsSentToPrincipal and displays Inquiry submitted to client. Receiving the offer converts the purchase job to the offer stage and displays Converted to offer successfully.

Correct or close an RFQ

After submission, the RFQ exposes only the corrections and closing actions allowed for its current stage. Use the action that matches the stage instead of assuming that every RFQ action is available everywhere.

Prerequisites

  • The RFQ is open in its purchase-job record.
  • The current stage is visible before you choose a reversal, regret, cancellation, download, or deletion action.

Steps

  1. Select the action that matches the RFQ state and the correction you need.

    ConditionAction
    The RFQ is at SentToPrincipal or ConsederAsSentToPrincipal and needs correctionSelect Enable Editing.
    The RFQ is at SentToPrincipal or ConsederAsSentToPrincipal and must be marked as regrettedSelect Regretted To Offer.
    The RFQ is at SentToPrincipal or ConsederAsSentToPrincipal and must be cancelledSelect Cancel RFQ.
    The RFQ is at CanceledInquiry and must be restoredSelect Consider RFQ As Not Cancelled.
    The RFQ is at RegretToOffer and the regret state must be reversedSelect Consider As Not Regretted.
    Printing is allowedSelect RFQ template.
    The RFQ is unstaged and the purchase job has more than one RFQSelect Delete RFQ.

Result: The RFQ changes only to the reversal, regret, cancellation, template, or deletion state exposed for its current stage. The available exit states include CanceledInquiry, RegretToOffer, and ConsederAsNotSentToPrincipal.

When an RFQ action fails

Match the message on screen to the correction below before repeating the action.

MessageCorrective action
Check mandatory field(s)Complete the required RFQ fields shown on the form.
Inquiry must have at least one itemAdd an item to the inquiry before saving or submitting it.
Please select one or more items to create a RFQ.Select at least one item for the new RFQ.
An error occurred while processing your requestCheck the RFQ stage and record permissions before retrying.
No remaining items. All items have been selectedReview the selected items; there are no unselected items left to add.
Package must have at least one itemAdd an item to the package.
This action is only allowed if you belong to that branchUse a branch to which your account belongs.
Please enter at least one emailEnter at least one email address before sending.
Items labeled as ‘Ready for Shipment’ or ‘Delivered’ cannot be deletedLeave those items in place and choose another item to remove.
Package products cannot be emptyAdd products to the package before saving it.
Saving validates the RFQ before committing it. If you leave with unsaved work, the screen's deactivation guard protects that work.
The RFQ action area and validation context

The RFQ messages also include the following messages. Apply the correction indicated by the message before retrying the action.

MessageWhen to use it
This Field Is RequiredComplete the field marked as required.
Required Offer TypeComplete the Required Offer Type field.
Required Bid Due DateComplete the Required Bid Due Date field.
Product package deleted from all inquiriesConfirm the package deletion result.
Item(s) RegrettedConfirm the regret result.
Item(s) CancelledConfirm the cancellation result.
Item(s) RejectedConfirm the rejection result.
Item(s) ReactivatedConfirm the reactivation result.
Email sent to client. Added to emails list activityConfirm the email-send result in the email activity.
Converted to offer successfullyContinue with the offer stage.
Please insert at least one productSelect at least one product.
Please insert at least one RFQCreate or select at least one RFQ.
Check RFQ mandatory field(s)Complete the required RFQ fields.
Selected sub-supplier is not among the requested vendorsSelect a requested sub-supplier.
This account already exists. Would you like to consider it as a sub-supplier?Choose the offered sub-supplier option when it matches the request.
Forbidden characters detected. Please remove them and try again.Remove the forbidden characters.
You already have a contact with this nameUse a different contact name.
Your request was completed successfullyConfirm that the requested action completed.
Just '_'‘-''.' And '&' Characters AcceptedUse only the accepted characters.
Product package deleted from all offersContinue with the quotation-stage record.
Product package deleted from all ordersContinue with the purchase-order record.
Order updated successfully. Undelivered. A draft invoice was deletedContinue with the updated order.
Job reactivated successfullyContinue with the reactivated job.
Converted to inquiry successfullyContinue with the inquiry record.
Check PO mandatory field(s)Complete the required purchase-order fields.
Please insert at least one POAdd at least one purchase order.
Offer must have at least one itemAdd at least one quotation item.
Order must have at least one itemAdd at least one purchase-order item.
Please enter action for each milstone Enter an action for each payment milestone.
Invalid input. The value must be greater than 0 and cannot exceed 999,999.00Enter a value within the displayed range.
Invalid input. Please enter a non-negative valueEnter zero or a positive value.
Invalid input. The tax rate must be between 0 and 100Enter a tax rate from 0 through 100.

Out of scope — Libraries and files, contact editing, and payment milestone editing

Use Purchase-job comments, files, and history or Libraries and files for the Attachment and Last Modifications tabs. Use Contact record for contact editing. Payment milestone editing is outside this RFQ task.

Continue after the RFQ

An offered RFQ becomes a quotation-stage purchase job. From there, procurement work continues through Quotations, POs, and Received; RFQ work and quotation work remain on separate pages.

Select Purchase-job quotations to continue with the quotation stage and the quotation-to-purchase-order work.

Was this page helpful?

Need help using the product?